Project Details

Project Type
Addition
Location
Birmingham, AL
Owner
Tractor & Equipment Company
General Contractor
Dunn Building Company

Partners & Method

Architect & Engineer
GMP Architect
Delivery Method
Design-Build

Summary

Design and construct a new 4,800 SF Pre-Engineered Metal Building addition to the existing TEC Weld Shop. The scope of this work includes some minor demolition, concrete foundations, masonry, overhead doors, personnel doors, painting,PEMB Addition, 25-ton Bridge Crane, compressed air piping and water piping, controlled ventilation system and construction of a new 600 amp electrical system to serve the new lighting and power devices.