Projects
Who we’re here for
Explosive Ordnance Exploitation Complex
Project Details
- Project Type
- New Construction
- Location
- Redstone Arsenal, AL
- Owner
- US Army
- General Contractor
- Southeast Cherokee
Partners & Method
- Subcontractor
- Dunn Building Company
- Architect & Engineer
- US Army Corps of Engineers - Mobile District
- Delivery Method
- Subcontractor
Summary
Plans and specs project consisting of furnishing and erecting three pre-engineered steel buildings and metal roof system. The pre-engineered steel buildings have 4" factory insulated roof panels and 3" factory insulated wall panels. The metal roof system will be installed over conventional steel framing with two layers of 2.5" rigid board insulation with water and ice shield.
