Project Type

New Construction

Location

Quinton, AL

Owner

Southern Company

General Contractor

Brasfield & Gorrie

Subcontractor

Dunn Building Company

Delivery Method

Subcontract

Summary

For this project, Dunn furnished and erected a 34,920 SF pre-engineered gypsum storage building on the Alabama Power-Plant Miller Limestone Prep & Gypsum Dewatering Project. Project included galvanized primary and secondary framing, insulated standing seam metal roof system, 5:12 roof pitch. The building was designed and erected around and over the gypsum transfer conveyor and radial stacker (which was in place prior to building erection). Of significance, the building was 164' clear span structure with a ridge height of 60'2".