Kohler Electrical Infrastructure
Project Type
New ConstructionLocation
Huntsville, ALOwner
Kohler Co.General Contractor
Burns & McDonnellSubcontractor
Dunn Building CompanyArchitect & Engineer
Burns & McDonnellDelivery Method
SubcontractingSummary
Dunn Building Company was contracted with Burns & McDonnell to install the duct bank for primary and secondary power feed (electrical by others). Dunn also installed equipment pad for the main power switches for the entire plant, place miscellaneous steel throughout plant for electrical supports and install two small steel mezzanines inside of plant.