Project Type

Addition

Location

Birmingham, AL

Owner

Tractor & Equipment Company

General Contractor

Dunn Building Company

Architect & Engineer

GMP Architect

Delivery Method

Design-Build

Summary

Design and construct a new 4,800 SF Pre-Engineered Metal Building addition to the existing TEC Weld Shop. The scope of this work includes some minor demolition, concrete foundations, masonry, overhead doors, personnel doors, painting,PEMB Addition, 25-ton Bridge Crane, compressed air piping and water piping, controlled ventilation system and construction of a new 600 amp electrical system to serve the new lighting and power devices.