International Intermodal Center – Testing & Remediation

For this project, Dunn Building Company cleaned the exterior EIFS, caulked and taped up joints and applied a new seal coating to the entire EIFS area.  On the interior we remediated molded area and replaced with new sheetrock.   The second and third levels received new ceiling tiles, new carpet, fresh paint on walls and new … Read More

Hoover Sportsplex Pre-Engineered Metal Building Package

Dunn Building Company was awarded package 1A – Pre-Engineered Metal Building Package for the Hoover Sportsplex in Hoover , AL. Dunn furnished and erected a total of 108,370 SF (92,120 SF of Building, 12,400 SF of Suspended Track and 3,850 SF of Catwalks). The metal building system consisted of 218’- 1 ½” wide x 40’-2” eave … Read More

Foley Event Center – Package 1

Dunn Building Company was awarded Package 1 of the Foley Event Center in Foley, Alabama.   The overall square footage is approximately 90,000 SF which includes Foundations – 72,000 SF and Mezzanines – 18,000 SF.   The scope of work for this project consists of site preparations, auger cast piling, foundations, pre-engineered structure, mezzanine structures, roofing and … Read More